PROJECT SUMMARY
Fire Suppression Solution For 400-Room Hotel Refurbishment in Edinburgh
Client: Main Contractor (Longstanding SmartMist Partner)
Location: Edinburgh, Scotland
Project Duration: 8 Months On-Site
SmartMist Role: Design and Installation of Water Mist Fire Suppression System
SmartMist was entrusted by a leading main contractor to deliver a state-of-the-art water mist fire suppression system for a high-profile refurbishment project in Edinburgh.This ambitious transformation converted a former office block into a luxurious 400-room hotel, requiring a fire safety solution that balanced exceptional performance with aesthetic discretion.Over eight months,SmartMist designed and installed a tailored system, seamlessly coordinating with multiple trades to meet the project’s demanding requirements while adhering to UK fire safety standards.